Join Our Mailing List

Subscribe to our mailing list to receive news releases and other materials related to Inspiration Energy Corp. Your email will never be shared or sold and you can opt out at any time.

Rottenstone

PROJECTS

Overview

The Rottenstone North copper-gold project is located within the Rottenstone Domain, a regional northeast-southwest geological corridor, that includes the past producing Rottenstone nickel-copper-platinum group elements-gold mine (Ni-Cu-PGE-Au), which from 1965-1968 produced some 26,057 tonnes of high-grade grading 3.28% Ni, 1.83% Cu and 9.63 g/t Pt+Pd+Au (Saskatchewan Mineral Deposits Index #09587).

The project is directly northwest and borders Ramp Metals Inc.’s Rottenstone SW copper-gold project which reported multiple gold zones from discovery hole Ranger-01 that included 73.55 g/t Au and 19.50 g/t Ag over 7.5 metres from 227 m, including 182 g/t Au and 60.8 g/t Ag over 1.5 m from 230.0 metres (Ramp Metals news release dated June 17, 2024).

Ramp is also targeting a new copper discovery found during a mapping and sampling program (Ramp Metals news release dated Jan 20, 2025) that trends right into Inspiration’s contiguous project.

Exploration Plans

Targets defined by a recent AMRT survey are located along trend and parallel to the Rush Discovery corridor, with the strongest anomalies concentrated in the southern part of the Project. Inspiration believes these results represent excellent drill-ready potential and is now formulating plans for a maiden drilling program.

Plans are currently being formulated to start exploration operations on the Rottenstone North Copper-Gold Project. Drilling at Rottenstone North is expected to commence shortly.